Total Inspections: 7
Total 483s Issued: 5
Total Warning Letters Issued: 0
Longest Inspection: 15 days
Shortest Inspection: 2 days
Average Length of Inspection: 6.3 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Johnny D NwankwoName | Inspections | Last Inspection |
---|---|---|
Nelson N Ayangho | 3 | 2024 |
Azeezat M Lawal | 3 | 2024 |
Tekalign Wondimu | 2 | 2024 |
David A Oluwo | 2 | 2024 |
Yaharn Su | 2 | 2023 |
Elena N Thomas | 1 | 2024 |
John D Mcintosh | 1 | 2024 |
Catherine O Lamptey | 1 | 2024 |
Michael O Idowu | 1 | 2024 |
Pamela N Agaba | 1 | 2024 |
Karen A Briggs | 1 | 2024 |
Marcellinus D Dordunoo | 1 | 2024 |
Olumide A Akinyemi | 1 | 2023 |
Pushpa S Jayasekara | 1 | 2023 |