Total Inspections: 5
Total 483s Issued: 3
Total Warning Letters Issued: 0
Longest Inspection: 10 days
Shortest Inspection: 2 days
Average Length of Inspection: 5.8 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Nelson N AyanghoName | Inspections | Last Inspection |
---|---|---|
Johnny D Nwankwo | 3 | 2024 |
Elena N Thomas | 2 | 2024 |
Azeezat M Lawal | 2 | 2024 |
David A Oluwo | 2 | 2024 |
John D Mcintosh | 1 | 2024 |
Victoria Spivak | 1 | 2024 |
Ruben C Quintana | 1 | 2024 |
Karen A Briggs | 1 | 2024 |