Total Inspections: 6
Total 483s Issued: 4
Total Warning Letters Issued: 0
Longest Inspection: 11 days
Shortest Inspection: 4 days
Average Length of Inspection: 9.8 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for John D McintoshName | Inspections | Last Inspection |
---|---|---|
Stephenie M Ortiz | 4 | 2024 |
Josh Renzo N Ramilo | 4 | 2024 |
Nelson N Ayangho | 1 | 2024 |
Christian F Gomez Lugo | 1 | 2024 |
Johnny D Nwankwo | 1 | 2024 |
David A Oluwo | 1 | 2024 |
Edmund F Mrak | 1 | 2024 |