Total Inspections: 10
Total 483s Issued: 8
Total Warning Letters Issued: 1
Longest Inspection: 15 days
Shortest Inspection: 2 days
Average Length of Inspection: 6.9 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Catherine O LampteyName | Inspections | Last Inspection |
---|---|---|
Pushpa S Jayasekara | 4 | 2025 |
Olumide A Akinyemi | 3 | 2024 |
Michael O Idowu | 2 | 2024 |
Ofuje D Daniyan | 1 | 2025 |
John D Mcintosh | 1 | 2025 |
Claude Noel Y Zanetsie | 1 | 2025 |
Adetutu M Gidado | 1 | 2025 |
Azeezat M Lawal | 1 | 2024 |
Johnny D Nwankwo | 1 | 2024 |
Suchan Kim | 1 | 2024 |
Yaharn Su | 1 | 2024 |
Syeda N Mahazabin | 1 | 2024 |
Vivin George | 1 | 2024 |
Marcellinus D Dordunoo | 1 | 2024 |
David A Oluwo | 1 | 2024 |
Karen A Briggs | 1 | 2023 |