Total Inspections: 68
Total 483s Issued: 23
Total Warning Letters Issued: 6
Longest Inspection: 239 days
Shortest Inspection: 1 days
Average Length of Inspection: 5.1 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Vickie L AndersonName | Inspections | Last Inspection |
---|---|---|
James P Stallings | 5 | 2012 |
Truong X Nguyen | 3 | 2010 |
Ka L Wong | 2 | 2016 |
Bryan A Galvez | 2 | 2016 |
Laverne Kimble | 2 | 2015 |
Karen L Bauer | 2 | 2010 |
Jeff M Uriarte | 2 | 2010 |
Deborah A Greco | 2 | 2008 |
Michael Araneta | 2 | 2008 |
Jocelyn E Massey | 1 | 2016 |
Grace P Santos | 1 | 2016 |
Joseph C Yen | 1 | 2016 |
Kirtida Patel | 1 | 2013 |
Durell L Giles | 1 | 2012 |
Angela Shepas | 1 | 2012 |
Binh T Nguyen | 1 | 2011 |
Yvette M Lacour-Davis | 1 | 2011 |
Yvonne T Lacour | 1 | 2009 |
Judy C Nepsa | 1 | 2008 |
William S Vitale | 1 | 2008 |
Selene T Torres | 1 | 2008 |
Mei-Chen Mu | 1 | 2008 |
Trudy R Papson | 1 | 2008 |
Charles L Larson | 1 | 2008 |