Total Inspections: 121
Total 483s Issued: 102
Total Warning Letters Issued: 2
Longest Inspection: 64 days
Shortest Inspection: 1 days
Average Length of Inspection: 5.8 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Robert C HoranName | Inspections | Last Inspection |
---|---|---|
Mindy M Chou | 4 | 2016 |
Gary J Lehr | 3 | 2009 |
Rory Geyer | 3 | 2009 |
Ronald Ifraimov | 2 | 2012 |
Charisse K Green | 2 | 2011 |
Parul M Patel | 2 | 2010 |
Cynthia J Lee | 2 | 2009 |
Bijoy Panicker | 1 | 2018 |
Rachael A Moliver | 1 | 2017 |
Rajiv R Srivastava | 1 | 2017 |
Demitria J Xiradakis | 1 | 2016 |
Anastasia M Shields | 1 | 2015 |
Robert C Steyert | 1 | 2014 |
Helen B Ricalde | 1 | 2014 |
Justin A Boyd | 1 | 2014 |
Neil J Bonzagni | 1 | 2011 |
Thomas E Friel | 1 | 2011 |
Sarah A Wangseng | 1 | 2010 |
Ramon A Hernandez | 1 | 2010 |
Chad N Thompson | 1 | 2010 |
Irina Gaberman | 1 | 2010 |
Edmund F Mrak | 1 | 2010 |
Kathryn A Nagy | 1 | 2008 |