Total Inspections: 61
Total 483s Issued: 34
Total Warning Letters Issued: 0
Longest Inspection: 26 days
Shortest Inspection: 1 days
Average Length of Inspection: 6.6 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Marlo-Ian M AlintanahinName | Inspections | Last Inspection |
---|---|---|
Marlo I Alintanahin | 13 | 2020 |
Dustin P Tran | 2 | 2021 |
Creighton T Tuzon | 2 | 2020 |
Sonya L Karsik | 2 | 2019 |
Scott D Stevens | 1 | 2024 |
Linda Galindo | 1 | 2024 |
Charles L Larson | 1 | 2023 |
Alexandria L Capuano | 1 | 2022 |
Juanj Wu | 1 | 2022 |
Juanita Banuelos | 1 | 2021 |
Sunitha K Rajaram | 1 | 2021 |
Janet Pulver | 1 | 2021 |
Kevin N Tran | 1 | 2020 |
William H Shackelford | 1 | 2020 |
Stephen C Smith | 1 | 2019 |
Akbar J Zaidi | 1 | 2019 |
Manuel A Moreno | 1 | 2019 |
Stephen R Souza | 1 | 2019 |