Total Inspections: 87
Total 483s Issued: 35
Total Warning Letters Issued: 3
Longest Inspection: 43 days
Shortest Inspection: 1 days
Average Length of Inspection: 5.0 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Kevin N TranName | Inspections | Last Inspection |
---|---|---|
Juanita Banuelos | 6 | 2022 |
Alexandria L Capuano | 5 | 2022 |
Creighton T Tuzon | 3 | 2020 |
Nancy Bogdanovic | 2 | 2023 |
Kirtida Patel | 2 | 2020 |
Angelica G Aziz | 2 | 2019 |
Janet Pulver | 2 | 2019 |
Eric C Fox | 2 | 2019 |
Michael S Call | 2 | 2018 |
Jordan I Abel | 1 | 2024 |
Scott D Stevens | 1 | 2024 |
Marlo-Ian M Alintanahin | 1 | 2020 |
Marlo I Alintanahin | 1 | 2020 |
Haejung An | 1 | 2019 |
Vanessa Y Jacobs | 1 | 2019 |
Desiree C Iya | 1 | 2019 |
Kimberly M Lichter | 1 | 2019 |
John A Liu | 1 | 2018 |
Joseph C Yen | 1 | 2018 |