Duty Station: Rockville MD
Total Inspections: 14
Total 483s Issued: 4
Total Warning Letters Issued: 0
Longest Inspection: 7 days
Shortest Inspection: 1 days
Average Length of Inspection: 1.8 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Crystal S HarrisName | Inspections | Last Inspection |
---|---|---|
Crystal S Harris-Smith | 14 | 2015 |
Adam C Hipko | 5 | 2015 |
Paul E Frazier | 1 | 2015 |
Deniza Karacic | 1 | 2015 |
Massoud Motamed | 1 | 2015 |
Dana M Lewis | 1 | 2015 |
Samuel A Hamblin | 1 | 2014 |