Total Inspections: 4
Total 483s Issued: 2
Total Warning Letters Issued: 0
Longest Inspection: 9 days
Shortest Inspection: 5 days
Average Length of Inspection: 7.8 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Zainab Y Mansaray-StormsName | Inspections | Last Inspection |
---|---|---|
Alifiya H Ghadiali | 2 | 2024 |
Jin S Hong | 1 | 2024 |
Laura M Ricles | 1 | 2024 |
Takele H Argaw | 1 | 2023 |
Yonggang Wang | 1 | 2023 |
Graeme E Price | 1 | 2023 |
Christine Harman | 1 | 2023 |
Laura Fontan | 1 | 2023 |