Total Inspections: 5
Total 483s Issued: 2
Total Warning Letters Issued: 0
Longest Inspection: 45 days
Shortest Inspection: 4 days
Average Length of Inspection: 12.6 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Valerie L KelesyanName | Inspections | Last Inspection |
---|---|---|
Ana P Barido | 3 | 2024 |
Chinyere A Asanya | 1 | 2024 |
Emily A Baldwin | 1 | 2023 |
Angelica M Chica | 1 | 2023 |