Designation: PROJECT SPECIALIST
Duty Station: Dallas TX 75204
Organizations: DHHS FDA ORA OGROP ORA OHAFO OHAFOW DHAFOWIII HAFIB
Total Inspections: 131
Total 483s Issued: 21
Total Warning Letters Issued: 2
Longest Inspection: 9 days
Shortest Inspection: 1 days
Average Length of Inspection: 0.3 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Tara A GrayName | Inspections | Last Inspection |
---|---|---|
Danny D Horner | 8 | 2011 |
Latorie S Jones | 5 | 2013 |
Jennifer D Young | 4 | 2011 |
Casey L Hamblin | 3 | 2013 |
Jamie M Bumpas | 3 | 2010 |
Jennifer Owens Dowdy | 3 | 2010 |
Tamera H Hunt | 3 | 2009 |
Young M Yoon | 2 | 2013 |
Coleen L Manoy | 2 | 2010 |
Haley L Coleman | 2 | 2010 |
Roy Baby | 2 | 2009 |
Christopher J Smith | 1 | 2014 |
Elmina E Akwo | 1 | 2014 |
CntrctMntr WalkerB | 1 | 2013 |
Lisa R Jennings | 1 | 2013 |
Rian L Pope | 1 | 2013 |
Patty P Kaewussdangkul | 1 | 2013 |
Anh Lac | 1 | 2013 |
Astrid M Rylander | 1 | 2010 |
Elvia J Cervantes | 1 | 2010 |
Brandon K Barbee | 1 | 2010 |
Amanda J White | 1 | 2010 |
Ashley N Williams | 1 | 2010 |
Adrian Rodriguez | 1 | 2009 |
Tracy J Washington | 1 | 2009 |
Seri L Essary | 1 | 2009 |
Olious D Evans | 1 | 2009 |