Total Inspections: 3
Total 483s Issued: 1
Total Warning Letters Issued: 0
Longest Inspection: 17 days
Shortest Inspection: 3 days
Average Length of Inspection: 7.7 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Stephon D TillisName | Inspections | Last Inspection |
---|---|---|
Mercedes N Overton | 2 | 2025 |
Ronda R Loyd Jones | 2 | 2025 |
Milton J De Jesus Tavarez | 1 | 2025 |
Gloria E Andia | 1 | 2024 |
Navneet Kaur | 1 | 2024 |
Andrew Le | 1 | 2024 |