Total Inspections: 14
Total 483s Issued: 6
Total Warning Letters Issued: 0
Longest Inspection: 141 days
Shortest Inspection: 1 days
Average Length of Inspection: 13.7 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Shelina ParvinName | Inspections | Last Inspection |
---|---|---|
Isaac N Baah | 2 | 2024 |
Alysia M Salonia | 2 | 2024 |
Thomas Cote | 2 | 2024 |
Yuyan Liang | 2 | 2024 |
Terry E Pierre | 1 | 2024 |
Suwaskie S Smith | 1 | 2024 |
Brenna L MacDowell | 1 | 2023 |
Christine M Rivera | 1 | 2023 |