Total Inspections: 6
Total 483s Issued: 4
Total Warning Letters Issued: 0
Longest Inspection: 5 days
Shortest Inspection: 4 days
Average Length of Inspection: 4.8 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Sarmistha SanyalName | Inspections | Last Inspection |
---|---|---|
Melkamu Getie Kebtie | 2 | 2024 |
Sheri L Stephenson | 1 | 2025 |
Angelica M Chica | 1 | 2024 |