Total Inspections: 16
Total 483s Issued: 5
Total Warning Letters Issued: 0
Longest Inspection: 6 days
Shortest Inspection: 1 days
Average Length of Inspection: 1.2 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Sarah R BarkerName | Inspections | Last Inspection |
---|---|---|
Deborah W Hsu | 2 | 2017 |
Thanh B Tran | 2 | 2010 |
Lilly O Barton | 2 | 2010 |
Yolanda D Mitchell-Lee | 1 | 2016 |
Cathryn M Groehnert | 1 | 2016 |
John C Su | 1 | 2010 |
Travell D Sawyer | 1 | 2010 |