Total Inspections: 51
Total 483s Issued: 19
Total Warning Letters Issued: 2
Longest Inspection: 30 days
Shortest Inspection: 1 days
Average Length of Inspection: 3.3 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Samuel L MurrayName | Inspections | Last Inspection |
---|---|---|
Christopher C Wilcox | 6 | 2016 |
Abraham M Maekele | 3 | 2017 |
Christopher B May | 3 | 2016 |
Claudette D Brooks | 2 | 2017 |
Young Kim | 2 | 2017 |
Sayeeda Hdabe | 2 | 2017 |
Miaja Umaedi | 2 | 2016 |
Trang N Cox | 1 | 2017 |
Melanie W Pishnery | 1 | 2017 |
Phillip M Pontikos | 1 | 2016 |
Dawn M Braswell | 1 | 2016 |
Mancia R Walker | 1 | 2016 |
Sonya M Edmonds | 1 | 2016 |
Gamal A Norton | 1 | 2015 |