Rafael Nevarez Nieves
FDA Investigator Report
Total Inspections: 30
Total 483s Issued: 18
Total Warning Letters Issued: 1
Inspection Details
Longest Inspection: 23 days
Shortest Inspection: 3 days
Average Length of Inspection: 6.0 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoRecent Inspections
Date | Company | City | Country | FEI Number | 483 |
---|
2016-03-03 | Lima & Pergher Industria e Comercio S/A | Uberlandia | Brazil | 3004364074 | |
2016-02-23 | Inovat Industria Farmaceutica Ltda. | Guarulhos | Brazil | 3004063802 | |
2016-02-12 | Bel Star S.A. | Tocancipa | Colombia | 3003840061 | |
2015-12-04 | Laboratorios Liomont, S.A. de C.V. | Ciudad De Mexico | Mexico | 3003948827 | |
2015-11-27 | Sintenovo SA de CV | Jiutepec | Mexico | 3008725935 | |
2015-11-20 | BOEHRINGER INGELHEIM PROMECO S.A. DE C.V | Ciudad De Mexico | Mexico | 1000183111 | |
2015-10-02 | Procaps S.A. | Barranquilla | Colombia | 3008338784 | |
2015-09-09 | Laboratorios Kener, SA de CV | Toluca | Mexico | 3006763268 | |
2015-08-28 | Laboratorios Sophia, S.A. De C.V. | Zapopan | Mexico | 1000310459 | |
2015-08-07 | Industrias Quimicas Falcon de Mexico SA de CV (Dr. Reddys) | Jiutepec | Mexico | 3002808297 | |
Co-Inspectors
Active Locations
Year-wise Inspection Count
- 2013: 3 inspections
- 2014: 12 inspections
- 2015: 12 inspections
- 2016: 3 inspections