Designation: SUPERVISORY CHEMIST
Duty Station: Bothell WA 98021
Total Inspections: 13
Total 483s Issued: 12
Total Warning Letters Issued: 0
Longest Inspection: 1 days
Shortest Inspection: 1 days
Average Length of Inspection: 0.9 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Peter C ChowName | Inspections | Last Inspection |
---|---|---|
Jose R Hernandez | 4 | 2010 |
Alicia M Mozzachio | 3 | 2008 |
Maxine H Wong | 2 | 2010 |
Barbara J Breithaupt | 2 | 2010 |
Stephen J Kilker | 2 | 2009 |
Barry Rothman | 2 | 2008 |
Marci M Deleon | 1 | 2010 |
Lawrence Y Lee | 1 | 2010 |
James S Stuart | 1 | 2009 |
Anita Narula | 1 | 2009 |