Total Inspections: 4
Total 483s Issued: 3
Total Warning Letters Issued: 1
Longest Inspection: 10 days
Shortest Inspection: 5 days
Average Length of Inspection: 7.3 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Nirjal BhattaraiName | Inspections | Last Inspection |
---|---|---|
Rabia Ballica | 2 | 2024 |
Kimberly L Schultz | 2 | 2023 |
Pankaj K Mandal | 1 | 2024 |
Phillip C Thai | 1 | 2024 |
Viviana R Ramirez | 1 | 2023 |
Graeme E Price | 1 | 2023 |
Latorie S Jones | 1 | 2023 |
Zhongren Wu | 1 | 2023 |
Travis S Bradley | 1 | 2023 |
David E Bailey | 1 | 2020 |
Prabhu P Raju | 1 | 2020 |
Eileen A Liu | 1 | 2020 |