Total Inspections: 7
Total 483s Issued: 7
Total Warning Letters Issued: 2
Longest Inspection: 12 days
Shortest Inspection: 2 days
Average Length of Inspection: 6.7 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Michael C ZubelewiczName | Inspections | Last Inspection |
---|---|---|
Gretchen L Trendel | 3 | 2023 |
Torrey M Ward | 2 | 2022 |
Conner N Mann | 1 | 2023 |
Matthew M Schuckmann | 1 | 2022 |
Jill J Tillman | 1 | 2022 |
Lisa L Flores | 1 | 2022 |
Wayne D Mcgrath | 1 | 2022 |