Total Inspections: 3
Total 483s Issued: 2
Total Warning Letters Issued: 0
Longest Inspection: 23 days
Shortest Inspection: 3 days
Average Length of Inspection: 11.7 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Lu ChenName | Inspections | Last Inspection |
---|---|---|
Young K Chou | 1 | 2024 |
Kara J Wright | 1 | 2024 |
Emmanuel Obulor | 1 | 2024 |
Tekalign Wondimu | 1 | 2024 |
Edwin L Hobbs | 1 | 2024 |
Anastasia M Shields | 1 | 2024 |