Lisa D Cash
FDA Investigator Report
Designation: Engineer Cnslt Sr N
Duty Station: Winchester MA 01890
Organizations: DHHS FDA ORA OGROP ORA ORS OMPTSLO WEAC IB
Total Inspections: 20
Total 483s Issued: 3
Total Warning Letters Issued: 0
Inspection Details
Longest Inspection: 3 days
Shortest Inspection: 1 days
Average Length of Inspection: 1.1 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoRecent Inspections
Date | Company | City | Country | FEI Number | 483 |
---|
2018-11-09 | Beijing Sundor Laser Equipment Co. Ltd. | Beijing | China | 3014741352 | |
2018-11-08 | Beijing E-Plus 3D Technology Co. Ltd. | Beijing | China | 3014955357 | |
2018-11-07 | Beijing CHN-TOP Science and Technology Co. Ltd. | Beijing | China | 3013970277 | |
2018-11-06 | Beijing Lasertech Co. Ltd. / II-VI Technologies (Beijing) | Beijing | China | 3012321719 | |
2018-11-02 | Dandong Xunlei Technology Co. Ltd. | Dandong | China | 3008866539 | |
2018-10-31 | Shenzhen Poda Laser Technology Co. Ltd. | Shenzhen | China | 3014990408 | |
2018-10-30 | Dongguan Sanhe Laser Technology Co. Ltd. | Dongguan | China | 3014576090 | |
2018-10-29 | Shenzhen Leikang Laser Technology Co. Ltd. | Shenzhen | China | 3012464468 | |
2018-10-26 | Zhongshan Baitian Photoelectric Technology Co. Ltd. (dba Magnum Lighting Technology Co. Ltd.) | Zhongshan | China | 3014965081 | |
2017-12-12 | Maxphotonics Co. Ltd. | Shenzhen | China | 3012950252 | |
Co-Inspectors
Active Locations
Year-wise Inspection Count
- 2017: 11 inspections
- 2018: 9 inspections