Total Inspections: 47
Total 483s Issued: 6
Total Warning Letters Issued: 0
Longest Inspection: 16 days
Shortest Inspection: 1 days
Average Length of Inspection: 2.4 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Keishla M Arroyo LopezName | Inspections | Last Inspection |
---|---|---|
Matthew R Barr | 4 | 2022 |
James E Trabert | 3 | 2022 |
Rafael Gonzalez | 2 | 2023 |
Jacob N Hamilton | 2 | 2021 |
Luis A Martinez-Larracuente | 1 | 2024 |
Marc Balzarini | 1 | 2024 |
Narahi J Alvarez Alcazar | 1 | 2022 |
Margo C Jones | 1 | 2022 |
Lisa A Bowden | 1 | 2021 |