Total Inspections: 5
Total 483s Issued: 5
Total Warning Letters Issued: 0
Longest Inspection: 11 days
Shortest Inspection: 5 days
Average Length of Inspection: 8.4 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Homero W AguilarName | Inspections | Last Inspection |
---|---|---|
Michael T Cyrus | 2 | 2024 |
John A Liu | 2 | 2023 |
Rachel C Stanton | 1 | 2024 |
Lillian S Wu | 1 | 2024 |
Crystal Monroy | 1 | 2024 |
Joanne E King | 1 | 2024 |
Walden H Lee | 1 | 2024 |
Veronica Fuentes | 1 | 2024 |
Uttaniti Limchumroon | 1 | 2024 |
Nicholas L Hunt | 1 | 2023 |