Total Inspections: 30
Total 483s Issued: 15
Total Warning Letters Issued: 0
Longest Inspection: 39 days
Shortest Inspection: 1 days
Average Length of Inspection: 5.4 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Hanna S LouvauName | Inspections | Last Inspection |
---|---|---|
Kimiko G Casuga | 7 | 2024 |
Jane G Choi | 5 | 2024 |
Breena L D'Ambrogi | 4 | 2025 |
Elaine S Chow | 4 | 2025 |
Katie T Duong | 2 | 2024 |
Bryce A Finger | 1 | 2024 |
Rachel V Leimbach | 1 | 2024 |
Jacqueline O Snell | 1 | 2024 |
Jorge L Bertran | 1 | 2024 |
Aimee K Contreras | 1 | 2024 |
Geoffrey M Leist | 1 | 2024 |
Savannah E Samp | 1 | 2023 |
Karla J Gibler | 1 | 2023 |