Total Inspections: 9
Total 483s Issued: 4
Total Warning Letters Issued: 0
Longest Inspection: 56 days
Shortest Inspection: 1 days
Average Length of Inspection: 12.9 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Eric J FergusonName | Inspections | Last Inspection |
---|---|---|
Melody M Ragasa-Leong | 3 | 2023 |
Daniel J Munoz | 1 | 2023 |
Jessica J Lee | 1 | 2023 |
Christy L Gadson | 1 | 2022 |
Esteban Rodriguez | 1 | 2019 |
Kimberly M Lichter | 1 | 2019 |