Elizabeth A Dakan

FDA Investigator Report

Total Inspections: 21

Total 483s Issued: 11

Total Warning Letters Issued: 0

Inspection Details

Longest Inspection: 28 days

Shortest Inspection: 2 days

Average Length of Inspection: 7.8 days

Discover the bigger picture. This is just the tip of the iceberg.

Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.

Schedule a Demo

Recent Inspections

DateCompanyCityCountryFEI Number483
2024-01-26ECENTIAL ROBOTICS SASGieresFrance3021060474
2024-01-16EPIPOLEInverkeithingUnited Kingdom3015627575
2024-01-09Granton Medical LimitedSheffieldUnited Kingdom3010286024
2023-12-14Intuitive Surgical, Inc.SunnyvaleUnited States3001675293
2023-07-17META DYNAMIC INCORPORATEDOrangeUnited States3013341129
2023-05-31MGI AMERICAS INC.San JoseUnited States3018007897
2023-05-03Abbott VascularMenlo ParkUnited States3005070406
2023-03-10Medtronic MiniMed, Inc.NorthridgeUnited States3003166194
2023-02-07BioCheck, Inc.South San FranciscoUnited States3002564473
2022-12-09Integrated Orbital Implants Inc.San DiegoUnited States3009688114

Sign Up to get the complete report.

Download 483s and EIRs for Elizabeth A Dakan

Co-Inspectors

NameInspectionsLast Inspection
Maida Henesian42021
Kenya Destin32022
Matthew M Vernon22023
Stephen R Souza12023
Mary R Hole12022
Eric J Heinze12022
Matthew D Schnittker12022
Eileen M Malecki12021
Christopher W Buser12021
Suzanne M Healy12021

Active Locations

Year-wise Inspection Count