Designation: Program Coordinator
Duty Station: Beltsville MD 20705-3121
Organizations: DHHS FDA CTP CTP OS RS
Total Inspections: 101
Total 483s Issued: 62
Total Warning Letters Issued: 0
Longest Inspection: 27 days
Shortest Inspection: 1 days
Average Length of Inspection: 1.6 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Daniel P StlaurentName | Inspections | Last Inspection |
---|---|---|
Randy V Bong | 7 | 2013 |
Kelly D Moore | 7 | 2012 |
Marc A Jackson | 5 | 2013 |
Linda M Cherry | 4 | 2014 |
Theressa B Smith | 4 | 2013 |
Gloria A Milster | 4 | 2012 |
Zachary L Stamm | 4 | 2010 |
Debra L Curtis | 4 | 2009 |
Teena H Aiken | 3 | 2014 |
Hanna L Potter | 3 | 2012 |
Carla R Hinz | 3 | 2012 |
Kristen E Szenderski | 2 | 2014 |
Carolyn J Cook | 2 | 2013 |
Jamie L Dion | 2 | 2012 |
Matthew R Dionne | 2 | 2009 |
Zachery L Miller | 2 | 2009 |
Kathleen S Tormey | 1 | 2013 |
Stephen T Hansen | 1 | 2013 |
Michael D Vansickle | 1 | 2011 |
Jessie E Morris | 1 | 2011 |
Holly L Sebastian | 1 | 2011 |
Jennifer A Baker | 1 | 2011 |
Andrea J Schmidt | 1 | 2010 |
Steven O Gauthier | 1 | 2009 |
Elisa J Beard | 1 | 2009 |
Kimberley A Hoefen | 1 | 2009 |
Larisa E Pavlick | 1 | 2009 |
Marie B Buen-Bigornia | 1 | 2009 |
Bryan J Love | 1 | 2008 |
Zachary A Miller | 1 | 2008 |