Daniel J Lahar

FDA Investigator Report

Designation: CSO(RESIDENT IN CHARGE)

Organizations: DHHS FDA ORA OGROP ORA OMPTO OMDRHO DMDRHOIII MDRHIB

Total Inspections: 296

Total 483s Issued: 85

Total Warning Letters Issued: 1

Inspection Details

Longest Inspection: 14 days

Shortest Inspection: 1 days

Average Length of Inspection: 2.2 days

Discover the bigger picture. This is just the tip of the iceberg.

Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.

Schedule a Demo

Recent Inspections

DateCompanyCityCountryFEI Number483
2024-11-15SymateseChaponostFrance3003672980
2024-11-07WEIL INDUSTRIESDuttlenheimFrance3030130442
2024-11-06AXILUM ROBOTICS SASSchiltigheimFrance3014805507
2024-10-31BizLink Robotic Solutions FranceChartresFrance3012834372
2024-09-19QUASAR MEDICAL (THAILAND) CO., LTDChonburiThailand3017844574
2024-09-12DELBio (Wujiang) Co., Ltd.WujiangChina3010804448
2024-09-05GUANGDONG BIOLIGHT MEDITECH CO., LTDZhuhaiChina3007305624
2024-07-23Avnet Embedded (Freiburg) GmbHEschbachGermany3006638842
2024-07-19NEURENT MEDICAL LimitedGalwayIreland3016813690
2024-07-16Schivo Medical LTDWaterfordIreland3008889904

Sign Up to get the complete report.

Download 483s and EIRs for Daniel J Lahar

Co-Inspectors

NameInspectionsLast Inspection
Juanj Wu32019
Juanj N Wu32019
Ivis L Negron Torres32011
Jenny L Mccardell22019
Jamie L Dion22015
Edith M Gonzalez22015
Linda F Murphy22014
Gloria A Milster22013
Felix J Marrero22012
James R Montero22012
Rong Guo12023
Eileen A Liu12023
Patty P Kaewussdangkul12023
Matthew M Vernon12016
Trevor R Beach12015
Alan P Kurtzberg12014
Elisa J Beard12013
Brent W Higgs12012
Isabel Y Espinosa12012
Nathan R Moon12012
Jessie E Morris12011
Janet Pulver12011
Grant L Davis12008

Active Locations

Year-wise Inspection Count