Total Inspections: 38
Total 483s Issued: 24
Total Warning Letters Issued: 0
Longest Inspection: 15 days
Shortest Inspection: 1 days
Average Length of Inspection: 4.4 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Christopher DoName | Inspections | Last Inspection |
---|---|---|
Thomas N Adjabeng | 4 | 2019 |
Steven B Chiu | 2 | 2022 |
Elaine S Chow | 2 | 2019 |
Steven M Galvez | 2 | 2019 |
Jeanne A Young | 2 | 2019 |
Yoon Kong | 1 | 2024 |
Makia P Dove | 1 | 2022 |
Diyo R Rai | 1 | 2019 |
Lourdes Andujar | 1 | 2019 |