Total Inspections: 27
Total 483s Issued: 18
Total Warning Letters Issued: 0
Longest Inspection: 1 days
Shortest Inspection: 1 days
Average Length of Inspection: 0.6 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Christin L TorresName | Inspections | Last Inspection |
---|---|---|
Jessie E Morris | 5 | 2009 |
Brent W Higgs | 4 | 2009 |
Neira Acevedo-Ramos | 3 | 2010 |
Marion W Nadeau | 2 | 2010 |
Nathan R Moon | 2 | 2009 |
Larisa E Pavlick | 1 | 2010 |
Kevin D Kallander | 1 | 2009 |
Jennifer L Wolfe | 1 | 2009 |
Elisa J Beard | 1 | 2009 |
Isabel Y Espinosa | 1 | 2009 |
Marie B Buen-Bigornia | 1 | 2009 |
James R Montero | 1 | 2009 |
Marc A Jackson | 1 | 2009 |
Linda M Cherry | 1 | 2009 |