Total Inspections: 3
Total 483s Issued: 2
Total Warning Letters Issued: 0
Longest Inspection: 4 days
Shortest Inspection: 4 days
Average Length of Inspection: 4.0 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Chad E SchmearName | Inspections | Last Inspection |
---|---|---|
Nicholas Z Lu | 2 | 2024 |
Javelle P Spann | 1 | 2024 |