Total Inspections: 4
Total 483s Issued: 3
Total Warning Letters Issued: 0
Longest Inspection: 6 days
Shortest Inspection: 5 days
Average Length of Inspection: 5.3 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Anna R KwilasName | Inspections | Last Inspection |
---|---|---|
Wei Wang | 2 | 2022 |
Elvira R Argus | 1 | 2024 |
Laura K Demaster | 1 | 2024 |
Viviana R Ramirez | 1 | 2024 |
Sharmila Shrestha | 1 | 2024 |
Jie He | 1 | 2024 |
Jianyang Wang | 1 | 2022 |
Jakob Reiser | 1 | 2022 |
Carl A Perez | 1 | 2022 |
Bo Liang | 1 | 2022 |
Priscilla M Pastrana | 1 | 2022 |
Christian Lynch | 1 | 2022 |