Total Inspections: 3
Total 483s Issued: 3
Total Warning Letters Issued: 0
Longest Inspection: 16 days
Shortest Inspection: 8 days
Average Length of Inspection: 11.0 days
Discover the bigger picture. This is just the tip of the iceberg.
Gain access to comprehensive analysis, detailed reports, AI assistant, and much more.
Schedule a DemoSign Up to get the complete report.
Download 483s and EIRs for Alejandro RodriguezName | Inspections | Last Inspection |
---|---|---|
Traci B Bickell | 1 | 2019 |
Brandon K Lawson | 1 | 2019 |
Siobhan A Gallagher | 1 | 2019 |
Sheila Alaghemand | 1 | 2019 |
Oluwaseyi Ojinni | 1 | 2018 |
Carrie E Jolly | 1 | 2018 |